The Quick Assign page displays all unfilled project roles on the left and all available people on the right.
People are sorted by idle time over the next year, meaning the longer they are on the bench, the higher they are on the list. This helps to identify underutilized team members on one side, and quickly find them a project on the other.
Drag and Drop
Simply drag a team member onto an unfilled project role and that allocation will be reflected throughout Bridgit Bench.
People and Project Filters
Similar to the People and Project views, the Quick Assign page can be filtered by People, Project and Group fields.
Export Reports
Click on the download icon to create a CSV report of all the unfilled roles.