Custom role assignment is used to further break down a person’s availability. Assignments can be updated by phases, custom date range, or on a weekly or monthly basis.
Table of Contents
Project List
- Select the required project.
- In the Operations tab, select Add role and choose a role.
- Select the
icon under the Assignment % column to open the Customize Assignment modal.
- Select the Assignment breakdown - custom range, monthly, or weekly.
- Allocation breakdown by phases is an option if the project has phases. Overlapping phases will populate a separate row.
- Allocation breakdown by phases is an option if the project has phases. Overlapping phases will populate a separate row.
- Modify the allocation values accordingly.
- Select Save to confirm.
Creating a custom assignment by monthly intervals, instead of phases, follows the same steps. Except, select Monthly under the Assignment breakdown.
Project Gantt
- With View Roles enabled in the Gantt settings, select the
icon to add a new role or select the
icon beside the role name.
- Select the
icon under Assignment %.
- In the Customize Assignment modal, select the Assignment breakdown - custom range, monthly, or weekly.
- Assignment breakdown by Phases will be an option if the project has phases.
- Modify the assignment values accordingly.
- Select Save to confirm.
People Profile
- In the Assignments tab, select the
icon under the % column.
- Select the
icon to customize.
- In the Customize Assignment modal, select the Assignment breakdown - custom range, monthly, or weekly.
- Modify the assignment values accordingly.
- Select Save to confirm.
Adding a Role Using Phase Dates
Roles created in the Project Settings can be added to a project. If the project has phases, roles can be added to a project using phases.
0% Assignment
Some roles aren't required for a continuous period of time on a project. When a role is set to 0% assignment, this means that the role is not required on the project at that time.
- For example, a Project Manager may be on a project for the Pre-construction and Construction phases but there is a two-month gap between the phases due to a delay in permits.
0% assignment is set via Custom Range in the Customize Assignment window.
- Select the required project.
- In the Operations tab, select the role.
- Select the
icon under the % column, then the
icon to customize.
- Select Custom Range under Assignment breakdown and create a custom range for the dates needed.
- Once the custom range has been created, change the % assignment under the Custom column on the far right to 0.
- Select Save to confirm.
Using this method will help ensure accuracy with role counts.