Projects > List > Reports
Table of Contents
Viewing the Report
The Hourly Profile module must be enabled to access this feature for Hourly data. Reach out to Bridgit Support (support@gobridgit.com) to change this setting.
The Spend Report provides a summary of the labor needed to complete the staffing plan for a project and track labor costs.
The report is created based on the following filters:
- Role Type - Salaried, Hourly or Salaried & Hourly
- Project - Select which project data to view
- Intervals - Select data time frame between Weekly or Monthly
- Units - Separated into Hours, Cost ($), and number of people within the time interval
- Status Breakdown - Separates each role row in the table to "Filled" or "Unfilled"
- Filter on Role Name - Filter down to one or more roles to view from the project
The "Total" column displays a figure based on the "Units" setting selected and the project duration.
The "Remainder" column displays the remaining units from the Total column based on the project end date. Either from the start date for future projects or the current date for current and past projects.
Viewing Costs
Cost data within the report can only be viewed by selecting the View Confidential Fields button , having View Financial Fields selected for a user's permission group, and selecting Cost in the "Units" tab.
The report displays rounded figures. To view cost data down to the cent, hover the mouse over any figures in the Planned Hourly ($) row or Total & Remainder Columns.
Cost details are generated based on the Cost Rate (hr) within a person's profile. If that field is empty, the default Role Cost Rate from Settings > Projects > Roles > Cost Rate (Hourly Roles) or Cost Rate (Salaried Roles) will be used in the Workforce report.
Workforce Cost
This section provides a comparative view of the budgeted cost for the project vs. the planned cost for project roles in the Operations section.
Precon roles are not included in this calculation.
Budget cost can be set in the project Details tab or by selecting the icon to input a value.
Planned cost is the total sum of all project roles (including filled & unfilled) factoring in each allocation percentage. The cost rate for each role is based on the person's individual cost rate set in their profile or the default rate in Settings > Projects > Roles > Default Role Values.
Roles without a default cost rate or a people profile cost rate will not be included in this calculation. Select the
icon to navigate to Settings to complete these fields.